Project case studies

Infrastructure

Chennai Data Centre Electrical & Infrastructure Enablement

Sify Chennai, NTT Chennai Chennai, Tamil Nadu

Electrical enablement and critical infrastructure support for Chennai data centre environments, including hyperscale-ready power distribution, redundancy planning, and uptime-focused deployment practices.

  • Data Centre
  • Critical Power
  • Redundancy
  • HT/LT
  • Commissioning

The Challenge

Aligning high-availability electrical systems with rapid campus-scale expansion and strict uptime requirements.

Our Solution

Applied modular HT/LT power blocks, resilient distribution paths, and phased commissioning aligned with live operations.

The Impact

Strengthened power reliability readiness for large-scale data centre operations across the Chennai ecosystem.

System Architecture

  1. NOCOperations & Monitoring
  2. PowerUPS / Backup Strategy
  3. DistHT/LT Distribution
  4. FieldSwitchgear & Protection

Project Sites & Milestones 3 locations

  • Sify Chennai (Siruseri) SIPCOT IT Park
    Campus-scale hyperscale data centre context with high IT load and large rack footprint.
  • NTT Chennai (Ambattur) Chennai West Corridor
    Colocation campus environment focused on resilient power and operational continuity.
  • Cross-Campus Reliability Layer Multi-site
    Standardized design approach for redundancy, monitoring, and phased energization.

Project commissioned.

Schedule Technical Review

Industrial · 2024

Integrated Steel Plant Automation

Tata Steel Jamshedpur, Jharkhand

End-to-end automation of a 3.5 MTPA blast furnace, converter, and rolling mill processes with redundant SCADA architecture and advanced process control.

  • SCADA
  • PLC-S7
  • DCS
  • Hot Rolling
  • Digital Twin

The Challenge

Integrating legacy systems with modern DCS while maintaining zero downtime during the transition.

Our Solution

Deployed a hybrid control architecture with parallel processing and phased cut-over strategy.

The Impact

Increased production efficiency by 18% and reduced energy consumption by 12%.

System Architecture

  1. L3ERP Integration
  2. L2Plant SCADA / DCS
  3. L1PLC & Safety Controllers
  4. L0Sensors & Actuators

Project Sites & Milestones 3 locations

  • Blast Furnace 'H' Zone 4
    Installation of redundant PLC controllers and safety interlocks.
  • Hot Strip Mill Zone 2
    SCADA integration for real-time coil temperature monitoring.
  • Sinter Plant Zone 1
    Conveyor automation and dust suppression control systems.

Project commissioned. Handover verified in 2024.

Schedule Technical Review

Industrial · 2023

Smart HT/LT Power Distribution Network

Reliance Industries Jamnagar, Gujarat

Modernization of high-tension (HT) and low-tension (LT) distribution systems with smart switchgear, remote monitoring, and IoT integration.

  • HT/LT
  • Smart Grid
  • IoT
  • Switchgear
  • Safety Systems

The Challenge

Real-time monitoring of 500+ distribution points across a sprawling 2000-acre complex.

Our Solution

Implemented an IoT-based smart grid solution with centralized dashboarding.

The Impact

Reduced electrical faults by 40% and improved maintenance response time by 60%.

System Architecture

  1. CloudAnalytics Dashboard
  2. EdgeIoT Gateway
  3. ControlSmart Relays
  4. FieldSmart Meters

Project Sites & Milestones 2 locations

  • Main Substation A North Sector
    Retrofitting of 66kV switchgear with smart IoT sensors.
  • Cracker Unit Process Area
    LT panel upgradation with intelligent motor control centers (iMCC).

Project commissioned. Handover verified in 2023.

Schedule Technical Review

Commercial · 2023

LEED Platinum Commercial Complex

DLF Limited Gurgaon, Haryana

Comprehensive electrical infrastructure design for a 50-story commercial tower, achieving LEED Platinum certification through intelligent systems.

  • BMS
  • Lighting Control
  • HVAC Automation
  • LEED
  • Fire Safety

The Challenge

Meeting stringent LEED Platinum energy efficiency standards in a high-density commercial zone.

Our Solution

Integrated BMS with AI-driven lighting and HVAC optimization algorithms.

The Impact

Achieved 30% lower energy footprint compared to standard commercial towers.

System Architecture

  1. MgmtBMS Workstation
  2. NetBACnet / KNX
  3. ControlDDC Controllers
  4. FieldSensors & VAVs

Project Sites & Milestones 2 locations

  • Tower A Podium Levels G-5
    Smart lighting control for retail and lobby areas.
  • Office Floors Levels 10-50
    Occupancy-based HVAC control and blind automation.

Project commissioned. Handover verified in 2023.

Schedule Technical Review

Infrastructure · 2022

Metro Rail Traction Power

DMRC New Delhi, Delhi

Design and commissioning of multiple traction power substations (TPS) for Phase 4 expansion.

  • Substation
  • Traction Power
  • SCADA
  • Railway Systems

The Challenge

Execution in high-density urban areas with limited shutdown windows.

Our Solution

Modular substation design with pre-fabricated components for rapid on-site assembly.

The Impact

Commissioned 3 months ahead of schedule, powering daily commutes for 2M+ passengers.

System Architecture

  1. OCCOperation Center
  2. RTURemote Terminal Unit
  3. ProtProtection Relays
  4. PowerSwitchgear & OHE

Project Sites & Milestones 3 locations

  • Mukundpur Depot Line 7
    Receiving substation (RSS) 66kV/25kV electrification.
  • Underground Section Janakpuri West
    Tunnel ventilation and auxiliary power systems.
  • Elevated Corridor Majlis Park
    Overhead Equipment (OHE) SCADA interfacing.

Project commissioned. Handover verified in 2022.

Schedule Technical Review

Industrial · 2024

Greenfield EV Manufacturing Facility

Mahindra Electric Pune, Maharashtra

Complete greenfield electrical setup for an advanced EV manufacturing plant, featuring robotic welding lines.

  • Robotics
  • Greenfield
  • Assembly Line
  • Safety PLC

The Challenge

Coordinating complex electrical loads for high-precision robotics and welding lines.

Our Solution

Designed a harmonic-filtered power network to ensure stable voltage for sensitive equipment.

The Impact

Enabled the plant to reach peak production capacity of 10,000 units/month within 6 months.

System Architecture

  1. MESManufacturing Exec.
  2. ScadaLine Control
  3. PLCRobotic Controllers
  4. DriveServo Drives

Project Sites & Milestones 2 locations

  • Body Shop Block B
    Robotic welding line power distribution busways.
  • Paint Shop Block C
    Explosion-proof electrical fittings and HVAC control.

Project commissioned. Handover verified in 2024.

Schedule Technical Review

Commercial · 2022

Retail Power Management

Phoenix Mills Mumbai, Maharashtra

Integrated power management system ensuring 99.99% uptime with intelligent DG synchronization.

  • Retail Electrification
  • DG Sync
  • ATS
  • Energy Management

The Challenge

Ensuring seamless power transition during grid failures without disrupting retail operations.

Our Solution

Deployed advanced ATS with sub-millisecond switching and load prioritization logic.

The Impact

Zero downtime recorded during peak festive seasons.

System Architecture

  1. EMSEnergy Mgmt System
  2. SyncAuto-Sync Panel
  3. DistPCC / MCC Panels
  4. SourceGrid / DG Sets

Project Sites & Milestones 2 locations

  • Central Atrium Main Hall
    Aesthetic lighting control synced with music systems.
  • Utility Block Basement
    DG Set synchronization panel and fuel management system.

Project commissioned. Handover verified in 2022.

Schedule Technical Review

Infrastructure · 2023

Water Treatment SCADA

Delhi Jal Board New Delhi, Delhi

Upgrade and integration of SCADA systems for critical water treatment facilities.

  • Water Treatment
  • SCADA
  • Telemetry
  • DCS

The Challenge

Integrating disparate legacy PLCs from different manufacturers into a unified SCADA.

Our Solution

Utilized open-protocol gateways (OPC UA) to unify data streams.

The Impact

Improved water quality monitoring accuracy by 25%.

System Architecture

  1. CenterCentral SCADA
  2. CommsRadio / GPRS
  3. LocalPump PLC
  4. InstFlow/Level Sensors

Project Sites & Milestones 2 locations

  • Pumping Station 1 Okhla
    VFD installation for 500KW raw water pumps.
  • Filtration Unit Chandrawal
    Automated backwash logic implementation.

Project commissioned. Handover verified in 2023.

Schedule Technical Review

Industrial · 2024

Pharma Manufacturing Automation

Cipla Ltd. Goa, GA

Batch process automation for a sterile pharmaceutical manufacturing line, compliant with GAMP 5.

  • Batch Process
  • Pharma Automation
  • GAMP 5
  • Validation

The Challenge

Meeting rigorous FDA 21 CFR Part 11 compliance for electronic records.

Our Solution

Implemented a fully validated batch management system with comprehensive audit trails.

The Impact

Passed regulatory audits with zero non-conformances.

System Architecture

  1. L4ERP / SAP
  2. L3Historian / EBR
  3. L2Batch Controller
  4. L1Clean Room HMI

Project Sites & Milestones 2 locations

  • Line 1 (Sterile) Clean Room
    HMI access control and biometric authentication integration.
  • Packing Area End of Line
    Vision system integration for blister pack inspection.

Project commissioned. Handover verified in 2024.

Schedule Technical Review

Have a Vision? We Build It.

From greenfield factory setups to complex brownfield automation upgrades, our engineering team is ready.